Figure 1-4 Material takeoff and pack-out list.

• American Trucking Association, Hazardous Materials Tariff Manual, ATM III-M.

Once the material arrives on site it should be checked against the Pack-Out List to ensure that all material shipped has arrived. The person assigned is responsible for maintaining and controlling deployed material and equipment and should conduct periodic inventories during the deployment.

After the work is completed, all equipment and material should be inventoried and packed for shipment. It is extremely important to clean, lubricate, and perform required maintenance on all equipment before packing. Failure to do so could lead to corrosion of the equipment, which would render it worthless in the time it takes to ship the equipment back to storage.