Figure 1 New steel tied back wall in outboard of existing wall

Existing sheet piling to remain

Fill as directed — New steel sheet piling

Isolate rod from wave and new sheet pile if rod attached to old structure

Isolate rod from wave and new sheet pile if rod attached to old structure

New valve •

For new tie back rods isolate from old sheet pile with PVC sleeve-

Tie rods with standard turnbuckle.